
Spicy information and requirement: 334kg/M3 turmeric powder,5 tons/day,
total volume is about 15CBM.Each autoclave work 8 hours/day, then
it needs 2 units
6000Liter chamber autoclave. Each cycle loading 2CBM powder, 6 CBM
powder/day
needs 3 cycles.
Specification to correspond the seasoning powder sterilization
requirements
A, 6000 liters motorized hinge double door, Chamber and Jacket of
304, PLC control system with Touch screen HMI, 4 pcs loading cart
and 8 pcs trolley of SUS304. 288 pcs loading tray of SUS304
B, Main parameters
Chamber size | W1000*H1500*D4000mm, 6000 liters |
External dimension | W1800*H2200*D4340mm |
Max working pressure: | 0.22Mpa |
Max working temperature | 134℃ |
Loading cart | 4pc of SUS304 |
Trolley | 8 pcs of SUS304 |
Loading trays | 288 pcs of SUS304 |
Energy Resources (Supplied by user) | |
Electric power | AC380V, 50Hz, 3Ph/N/E, 7.5KVA |
Soft Water | 0.15----0.3MPa |
Compressed air | 0.5~0.7MPa |
Steam | 0.5~0.7MPa |
C, 1 year warranty with spare parts
D, Delivery time: 30 days
E,Optional Steam generator 500kg/h
F.Water softener: 1Kg/h
G.Air compressor: 30L/min
Steam generator
Main Machine | |||||
No. | Item Name. | Specification | Qty | Price(USD) | Remark |
1 | Vertical Gas Fired Steam Boiler | LSS0.5-0.7-Q | 1set | ||
1.1 | Feed water pump | 1.1KW | 1set | ||
1.2 | Liquid level indicator | DN15 | 1unit | Honeywell-USA | |
1.3 | Safety valve | DN40 | 1unit | ||
1.4 | Pressure controller | PN1.0 | 3sets | Fengsheng-Japan | |
1.5 | Pressure Gauge | 0-1.0Mpa | 1unit | ||
1.6 | Blow down valve | DN25 | 1unit | ||
1.7 | Control Panel | 1 set | |||
1.8 | Burner | Two-stage Fire | 1set | Bultur-Italy | |
2 | Boiler Package | ||||
Auxiliary Machine(Options) | |||||
2 | Steam Header | ¢159 | 1 set | ||
3 | Water Softener | 0.5Ton/hr | 1 set | Fleck,USA | |
Note: 1.As to options item,user could choose them if needs.
2. Burner,instrumentation valves and others are packaed separately.
Model: LSS0.5-0.7-Q
a. Parameter
Steam Capacity: 500Kg/hr
Rated working pressure: 0.7Mpa (7Kgf/cm2)
Hydraulic testing pressure: 1.05Mpa(10.5Kgf/cm2)
Fuel: LPG
Light diesel oil: 35KG/h
Thermal Efficiency: 89%
Water Pump Power: 1.1KW
Power Supply: AC/220V/50Hz,AC/380V/50Hz
Thermal Power: 350KW
Heating Surface: 12.1㎡
Saturated steam temperature:170°C
Main steam outlet: DN40 (1-1/2”)
Water inlet: DN25(1’)
Overall dimension: (Diameter×Height, mm): Φ1320×2340
Weight: 2100Kg
b. Burner
Gas-fired burner imported form Baltur-Italy
③ Boiler structure and design
(1)According to Chinese standard.
(2)High efficiency segregation apparatus.
(3)Large access hole design.
(4)Alarm and stop running boiler at lower level.
(5)Alarm and stop running at excess current.
(6) Three-pass water tube structure.
④ Combustion chamber fittings and control system for boiler
(1)Fan and inlet damper (automatic);
(2)Flame monitor;
(3)Automatic control set for the pressure limit;
(4)Automatic starting set for pre & back purging;
⑤ Boiler accessories and external equipment
(1)Feed water pump 1set
(2)Liquid level indicator 1unit
(3)Safety valve 1unit
(4)Pressure controller 3sets
⑥ Inspection
(1)Supervised and inspected by site person of Technical Supervision
Bureau Boiler Institute according to national standard.
(2)Boiler weld will be subject to 100% X-ray tested, and then
submit test report.
(3)Do commissioning test for boiler and submit test report.
(4)Provide quality-qualified certificate.
⑦ Documents
(1)Boiler general drawing with review & approval stamp by
Chinese Inspection Association for Special Equipment and blue
drawing for main body.
(2)Boiler safety & quality supervision inspection certificate.
(3)Product quality certificate.
(4)Pressure parts strength calculation sheets.
(5)Safety valve discharge calculation sheet.
(6)Confirmation list for debugging.
(7)Boiler operation, installation and maintenance manual.
c. Packing Terms
Professional export plywood cases suit for Sea shipping.
d. Delivery Time:
Within 25 working days after contract signed and advanced payment
reach to our account.
e. Warranty&After-sale Service
One year for repairing free charge after installation product.
During full lifetime we will prefer supply maintenance. Our company
also will be charge of training for operation and maintenance of
boiler free charge.
ZHANGJIAGANG MEDPHARM MACHINERY LTD.
MEDPHARM Company team is committed to providing quality sterilization products, service, parts and
maintenance training at significant savings. From customized parts packages to turnkey equipment
acquisition and installation, our innovative sterilization solutions are designed to meet our customers' needs.
We understand that untimely breakdowns are costly and can be detrimental to your everyday operations.
Our service team is compromised of expert technicians that respond quickly to all of your service needs.
We offer on-site service support including inservices, installation and deinstallation of your equipment. From
breakdown repairs to comprehensive maintenance programs, we have an innovative service solution for you.
We will service on-Site Repairs.Our staff is equipped with the resources required to provide you with
on-site, on-time repairs in compliance with manufacturer specifications. We also provide installation,
deinstallation, and inservices on most makes and models of sterilization equipment. Near or far we can
provide you with service support that you need.
Our reconditioning background has taught us of the importance of having quality parts on hand at all times.
We have a large inventory of individual repair parts, as well as preventive maintenance kits, and consumables
in stock and ready to ship today.
With our expert technical support staff, it is not always necessary to have part numbers to place an order.
We will help you identify the quality parts that you need.